
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
As a U.S. operations manager, you're battling high water bills and regulatory pressures on cooling tower water use. Our FRP cooling towers from Hebei Longxuan reduce evaporation and drift losses, ensuring compliance and ROI.
Get Free Quote in 24hOptimize cooling tower water use is critical in 2026, with U.S. water costs rising 15% annually (EPA data). Hebei Longxuan's fiberglass reinforced plastic (FRP) cooling towers minimize waste through advanced design.
High water consumption plagues U.S. industrial facilities, driving up costs and risking fines.
Our Powerful Factory in Hebei, China, delivers Quality Assurance with OEM/ODM Design and High-Speed Delivery (4-6 weeks to USA ports).
| Specification | Details |
|---|---|
| Water Flow Rate | 50-5000 m³/h (reduces use by 25-35%) |
| Drift Eliminator | PVC, 0.005% drift |
| Material | FRP (ISO 9001 certified) |
| Fill Type | PVC/FRP, high-efficiency |
A Texas refinery cut cooling tower water use by 28% post-installation, per case study.
Use high-efficiency drift eliminators and FRP fills—our towers achieve 30% savings.
Monitor cycles of concentration (4-6 ideal), automate blowdown. We provide SCADA integration.
Yes, NSF/ANSI 61 certified, compliant with EPA water efficiency standards.
Quote in 24h, OEM design in 7 days, delivery 4-6 weeks FOB Tianjin to USA.

Full OEM/ODM, 2-year warranty, remote monitoring support.
FRP avoids corrosion-induced leaks, sustains lower water loss over time.
T/T, L/C, PayPal. Secure, compliant transactions.
Limited-time: Free water audit + 10% off first order. Ships in 4 weeks. Risk-free: 30-day money-back.
Privacy policy: Your data is secure. Learn more.
"Outstanding! Water use down 35%, beats competitors' quality hands down."
"Fast delivery, top service. Highly recommend for cooling tower efficiency."
"FRP towers transformed our water management. Quality and price unbeatable."
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China
Trusted by Industry Leaders
fr4-sheet corrosion-resistant-fire-safe-frp
Certifications: CE, RoHS, ISO 9001, NSF/ANSI 61. Full compliance for U.S. imports.
Join Our Clients →