
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
Struggling with skyrocketing water cooling tower prices in the USA? Hebei Longxuan delivers industrial-grade FRP cooling towers at unbeatable rates—reliable cooling for your operations without compromising quality.
Get Free Quote in 24hAs a purchasing manager in the USA, you're facing high water cooling tower prices amid supply chain disruptions. Here's what our clients tell us:
Ready to cut costs? Discover factory-direct pricing.
Hebei Longxuan Environmental Protection Equipment Co., Ltd., a leading Chinese FRP manufacturer, offers water cooling tower prices starting at $5,000/unit—30-50% below USA market rates. Our powerful factory ensures OEM/ODM customization and high-speed delivery in 4-6 weeks.
| Model | Capacity (T/h) | Dimensions (m) | Price Range (USD) | Applications |
|---|---|---|---|---|
| LX-100 | 100 | 2x2x3 | $5,000 - $8,000 | Small plants |
| LX-500 | 500 | 4x4x5 | $15,000 - $25,000 | Industrial |
| LX-1000 | 1000 | 6x6x7 | $30,000 - $45,000 | Power plants |
Case Study: USA food processor reduced cooling costs by 42% with our LX-500. Request brochure.
Our FRP models range $5,000-$45,000 based on capacity—30% less than USA suppliers.
Quote in 24h; delivery 4-6 weeks via sea freight.

Yes, full OEM/ODM for your specs.
T/T, L/C, PayPal—secure for USA buyers.
2-year warranty, remote support, spare parts stocked.
Limited-time: Free sample parts + 5% off first order. Risk-free with money-back guarantee.
Privacy policy: Your data is secure—see full policy.
With 25+ years in fiberglass reinforced plastics at Hebei Longxuan, I've overseen 500+ cooling tower projects for USA clients. Featured in Industrial Cooling Journal.
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China
Trusted by Industry Leaders
swing-valve shaft-seal-ring