
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
As a U.S. operations manager, you're battling high energy costs and unreliable tower pack media. Our FRP tower pack delivers superior thermal performance and durability.
Get Free Quote in 24h
You know the drill: tower pack failure leads to downtime and skyrocketing costs.
Ready to fix these? Discover our solution below.
Hebei Longxuan's tower pack (aka cooling tower fill pack) uses fiberglass reinforced plastic for unmatched strength and heat transfer.
| Specification | Details |
|---|---|
| Material | FRP (Fiberglass Reinforced Plastic) |
| Specific Surface Area | 250-450 m²/m³ |
| Void Ratio | >95% |
| Max Temp | 120°F (50°C) |
| Sheet Thickness | 0.4-0.6 mm |
| Certifications | CE, RoHS, ISO 9001, Compliant with U.S. EPA |
Applications: Power plants, petrochemical, HVAC systems. Case Study: Texas refinery cut cooling costs 28% post-install. Request Custom Design
"Switched to Longxuan's cooling tower fill pack – reduced energy by 22% in our California plant." – Operations Mgr, PetroCorp USA
Certificates: ISO 9001, CE, RoHS, CB – Fully compliant for U.S. import.
It's structured or random packing media that enhances water-air contact in cooling towers for efficient heat dissipation.
High-speed: 3-4 weeks via ocean freight from our Hebei factory.
Yes, full OEM/ODM for industrial cooling tower packing – sheet angle, density, size.
T/T, L/C, PayPal. Compliant with U.S. trade regs.

24/7 support, free installation guides, 5-year warranty.
Absolutely – FRP resists corrosion better than PVC/PP.
Free samples for first 50 U.S. inquiries. 100% money-back if not satisfied. Ships risk-free.
WhatsApp: +86 18631823130 | Email: longxuanfrp@gmail.com
Privacy assured – See our policy.
"Best tower packing media we've used. Quality beats U.S. suppliers at half price!" – Mike R., Texas Refinery ★★★★★
"Fast delivery and perfect fit for our HVAC towers. 30% cost down!" – Sarah L., Florida Plant ★★★★★
"OEM design was spot-on. Highly recommend for cooling tower pack needs." – John D., NY Power Co ★★★★★
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China