
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
Solve your fire truck water storage woes with durable polyethylene tanks that cut weight by 40% and boost payload—ideal for USA fire departments facing high costs and unreliable suppliers.
Get Free Quote in 24h
As a fire department operations manager, you know unreliable tanks can compromise emergency response. Here's what you're up against:
Ready to eliminate these headaches? Discover our solution below.
Our poly fire truck tanks, crafted from advanced polyethylene reinforced with FRP composites, deliver unmatched durability. As China's leading exporter, we leverage a powerful factory for OEM/ODM designs and high-speed delivery to the USA.
| Specification | Details |
|---|---|
| Material | High-Density Polyethylene (HDPE) + FRP Reinforcement |
| Capacity | 500-4000 Gallons |
| Weight | 0.8 lbs/gallon (vs. 2.5 lbs steel) |
| Temp Range | -40°F to 140°F |
| Certifications | NFPA Compliant, ISO 9001, RoHS |
| Warranty | 10 Years |
Real-World Application: Deployed in California wildfire fleets—reduced downtime by 25% during 2025 season.
Galvanized-Pipe Non-Return-Valve
High-density polyethylene (HDPE) with optional FRP reinforcement for superior strength and corrosion resistance.
Yes, full OEM/ODM services for brands like Pierce or E-One—lead time 4 weeks.
4-6 weeks via sea freight to major ports like LA or NY, with tracking.

Fully NFPA 1901 compliant, DOT certified for transport.
T/T, L/C, PayPal; 30% deposit, balance on shipment.
10-year warranty, free technical support, on-site installation guidance.
35% cheaper, 40% lighter, no rust—ideal for long-term ROI.
Free samples available. 100% money-back guarantee. USA delivery in 4 weeks.
Privacy policy: Your data is secure. See full policy.
John D., Fire Chief, CA (Verified 2025)
Sarah L., Ops Manager, TX (Verified 2025)
Mike R., Supply Chain Lead, NY (Verified 2026)
Lisa T., Technical Director, FL (Verified 2025)
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China
Trusted by Industry Leaders