
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
As a purchasing manager dealing with aggressive HCl, you face constant leaks, replacements, and skyrocketing costs. Our FRP hydrochloric acid storage tank material eliminates these issues with proven durability.
In the US chemical industry, hydrochloric acid storage tank material failures cost manufacturers over $500M annually in downtime and repairs (EPA data, 2025).
Ready to fix this? Discover FRP solutions below.
Hebei Longxuan's FRP (Fiberglass Reinforced Plastic) tanks—glass fiber reinforced with vinyl ester resin—resist 99% HCl up to 50°C for 20+ years, per ASTM D543 tests.
| Property | FRP Specification | Benefit vs. Steel/HDPE |
|---|---|---|
| Corrosion Resistance | 99% HCl, pH 0-1, 50°C | 20x longer life |
| Tensile Strength | 500 MPa | Lightweight: 1/4 steel weight |
| Operating Temp | -50°C to 120°C | No warping |
| Capacity | 1-100 m³, custom | OEM/ODM design |
| Delivery | 2-4 weeks | High-speed from China factory |
FRP with vinyl ester resin offers unmatched corrosion resistance for 30-37% HCl, outperforming steel or HDPE.
Yes, up to 99% HCl at 50°C, backed by 20+ years of field data.
FRP is ideal; avoids pitting unlike PVC or PP.
2-4 weeks via high-speed sea/air from our Hebei factory.
Full OEM/ODM, 10-year warranty, free remote support.

T/T, L/C, PayPal; compliant with US import rules.
Free sample available. 100% money-back if not satisfied. Ships to USA in 24h quote turnaround.
"Best HCl tank material we've used. Zero corrosion after 2 years—saved us 35% on costs!" – Mike R., Purchasing Mgr., CA
"Fast delivery, top quality FRP. Exceeded expectations for our 50m³ HCl storage." – Sarah L., Ops Director, TX
"OEM design was perfect. Reliable supplier beating US prices by 30%." – Tom K., Supply Chain, NY
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China
Proven by US Industry Leaders
FRP-Cable-Tray MPP-Cable-Protection-Conduit