
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
As a U.S. operations manager, you're battling high water costs and unreliable cooling from evaporative heat loss in industrial systems. Our corrosion-proof FRP cooling towers minimize uncontrolled evaporation, cut water use by up to 20%, and ensure stable heat rejection—backed by China's powerful supply chain for fast delivery.
In industrial cooling towers, evaporative heat loss is the primary mechanism for heat rejection via water evaporation—typically 70-80% of total cooling. But uncontrolled loss leads to massive inefficiencies. Here's what you're facing:
Standard towers lose 1-2% of recirculated water to evaporation per cooling cycle. For a 500-ton system, that's 5,000 gallons daily—costing U.S. facilities $50,000+ yearly in makeup water (EPA data).
Metal towers suffer pitting from concentrated minerals post-evaporation, causing 15-20% unplanned downtime (Dodge Data reports). Your operations grind to a halt.
U.S. weather swings disrupt evaporation rates, dropping approach temperatures by 5-10°F and forcing fans to run 25% harder.
Poor drift control amplifies losses, hiking energy use by 30% amid rising U.S. utility costs.
Our fiberglass reinforced plastic (FRP) cooling towers from Hebei Longxuan optimize evaporative heat loss through precise engineering, reducing water waste and boosting ROI. Calculate evaporative heat loss easily with our formula: Evaporation Rate = 0.00085 × Circulation Rate × Range (in °F).
| Model | Capacity (Tons) | Evaporation Rate (%) | Approach (°F) | Material |
|---|---|---|---|---|
| LX-100 | 100 | 1.2 | 5 | FRP |
| LX-500 | 500 | 1.0 | 4 | FRP |
| LX-1000 | 1000 | 0.9 | 3.5 | FRP |
A Texas petrochemical plant using our LX-500 reduced evaporative heat loss by 18%, saving 120,000 gallons/year. Ideal for power plants, HVAC, and data centers—minimize evaporative heat loss today.
Use: Evaporation = 0.001 × Flow Rate (GPM) × Temp Range (°F). Our engineers provide free calculators.
Yes, by 20% via high-efficiency fills and eliminators—ideal for U.S. water regs.

Quote in 24h, 30% deposit, L/C or T/T payment, 4-week delivery to West Coast.
Full OEM/ODM, 2-year warranty, U.S. remote monitoring.
FOB Tianjin, DDP options, duties compliant.
Limited stock on LX series—free samples for qualified U.S. buyers, 60-day money-back guarantee. Beat high prices and low quality.
WhatsApp: +86 18631823130 | Tel: +86 17631849152
Email: longxuanfrp@gmail.com | Contact Page
Add: 20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei, China
John M., Florida Power Plant ★★★★★
"Evaporative heat loss down 19%! Best value from China—top service."
Lisa K., California Data Center ★★★★★
"High quality FRP, fast OEM delivery. Crushed competitors on price."
Tom S., Texas Manufacturing ★★★★★
"25% efficiency gain, no corrosion. Recommend for U.S. ops."
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China
Trusted by Industry Leaders: Social Proof
Featured Client Logos
diagram-of-a-cooling-tower evaporative-cooling-tower
Customer Testimonials with Proven Results
Global Certifications and Compliance
U.S. import-ready, full privacy policy at our site.