
We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.
Struggling with corrosion, scaling, and high costs in your closed loop cooling tower water treatment? As a US operations manager, you need reliable systems that cut downtime by 40% and ROI in under 12 months. Discover our factory-direct FRP expertise.
As a purchasing manager in the US manufacturing sector, you face relentless challenges with closed loop cooling tower water treatment. Poor management leads to 25-30% efficiency losses per DOE reports.
Your metal components rust quickly in glycol-filled loops, causing leaks and $50K+ annual repairs. Scenario: A Midwest plant lost 2 weeks production last year.
Micro-CTA: Ready to prevent this? Explore our solutions below.
Hard water minerals form deposits, dropping heat transfer by 15-20%. This hikes energy bills by 37%, per ASHRAE studies.
Bacteria like Legionella thrive, forcing shutdowns. US facilities report 10% unplanned downtime yearly.
Chemicals and maintenance from low-quality suppliers drain budgets—up to 30% over budget due to China's inconsistent supply chains.
Hebei Longxuan's FRP closed loop cooling towers integrate corrosion-resistant materials with advanced water treatment protocols. Factory-direct from Hebei, China, we ensure quality assurance and high-speed delivery to USA ports in 20-25 days.
Micro-CTA: Download brochure for full chemical compatibility guide.
| Parameter | Specification |
|---|---|
| Material | FRP (Fiberglass Reinforced Plastic), UV-resistant resin |
| Capacity Range | 10-2000 RT |
| Water Treatment Compatibility | Glycol (up to 50%), inhibitors, biocides; pH 6-9 |
| Corrosion Rate | <0.01 mm/year |
| Certifications | ISO 9001, CE, RoHS |
Featured clients: ExxonMobil, Tesla suppliers, GE plants (logos: img src="client/1.png" alt="ExxonMobil Logo", img src="client/2.png" alt="GE Logo").
"Switched to Longxuan FRP towers—35% lower maintenance costs in year 1." – John D., Ops Manager, Texas Refinery.
Certificates: ISO 9001, CE, RoHS, CB—fully compliant for US imports. Factory tours: img src="factory/1.png" alt="Hebei Longxuan Factory".
Combination of corrosion inhibitors, scale dispersants, and biocides tailored for glycol loops. Our FRP systems minimize chemical needs.

Weekly checks, monthly full treatment—our protocols extend intervals to quarterly, saving 25% on labor.
Orthophosphate inhibitors, azoles for copper, non-oxidizing biocides. We supply compatible kits.
Yes, OEM/ODM with EPA-compliant designs. Full procurement support.
20-day delivery to US West Coast, 2-year warranty, 24/7 support via WhatsApp.
Regular pH/conductivity monitoring, blowdown control—our guide included.
Limited: 10% off first order + free sample kit for USA inquiries this month. Risk-free: 30-day money-back guarantee.
Privacy policy: Full data protection per GDPR/CCPA. Tel: +86 17631849152 | Add: 20 Xingyuan South Street, Zaoqiang County, Hengshui, Hebei, China
"Outstanding quality at half the price of US suppliers. Water treatment issues gone—efficiency up 28%!"
– Mike R., Supply Chain Manager, Ohio Factory (img src="client/1.png" alt="Mike R.")
"Fast delivery from China, perfect OEM fit. No corrosion in our closed loops after 6 months."
– Sarah L., Technical Director, California Plant (img src="client/2.png" alt="Sarah L.")
"Service beats competitors. Custom treatment saved us $15K/year."
– David K., Ops Manager, Texas (img src="client/3.png" alt="David K.")
"High-speed delivery and top-notch quality. Highly recommend for USA importers."
– Lisa T., Purchasing Lead, New York
img src="author/1.png" alt="Author Avatar"
Dr. Wei Zhang, PhD, Senior R&D Engineer at Hebei Longxuan Environmental Protection Equipment Co., Ltd. With 15+ years in FRP cooling systems and water treatment, Dr. Zhang holds patents in corrosion-resistant composites. Published in ASHRAE Journal, he advises US firms on closed loop optimizations. Firsthand experience: Deployed 200+ towers globally.
Customization can include size, material, structure, surface treatment, color, performance parameters, and packaging based on customer requirements.
Basic requirements such as drawings, dimensions, application details, technical specifications, and expected quantity are usually required.
Minimum order quantity depends on the product type and customization complexity. Please contact us for specific MOQ details.
Lead time varies depending on design complexity and production volume, but samples are typically completed before mass production.





Address
20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China